[grisbi-bugs] [Grisbi-0.6.0 0000744]: Scheduling Custom Dates

bugtracker at grisbi.org bugtracker at grisbi.org
Wed Nov 25 09:37:52 CET 2009


A NOTE has been added to this issue. 
====================================================================== 
http://grisbi.tuxfamily.org/mantis/view.php?id=744 
====================================================================== 
Reported By:                twodogron
Assigned To:                
====================================================================== 
Project:                    Grisbi-0.6.0
Issue ID:                   744
Category:                   Main
Reproducibility:            always
Severity:                   minor
Priority:                   normal
Status:                     feedback
Plateforme:                  
OS:                         Windows 
Version OS:                 XP Professional SP3 
Unstable Impact:            Yes 
Version GTK:                2.16.6 
====================================================================== 
Date Submitted:             11-21-2009 19:45 UTC
Last Modified:              11-25-2009 08:37 UTC
====================================================================== 
Summary:                    Scheduling Custom Dates
Description: 
The "period" field is greyed out and I am unable to select a period when I
select "Custom"
If I first save the new entry and then edit it after saving it I can now
enter the period field (for example :- the number of days or weeks etc..)
====================================================================== 

---------------------------------------------------------------------- 
 guneeyoufix - 11-24-09 21:40  
---------------------------------------------------------------------- 
I didn't really undertand the core of the problem. What exactly are you
trying to do? 

Could you also specify which version of grisbi you are using?

Thanks 

---------------------------------------------------------------------- 
 JP Joubert - 11-25-09 08:37  
---------------------------------------------------------------------- 
It's true with Window Vista too : When Creating a scheduled transaction and
selected custom , unable to enter anything in the two next field limited
date ("Date limite") and period
in the first , when clicking , the calendar is shown , but when selecting
a date , nothing is entered in the field
The second is greyed and do not accepts any entry
Jean Pierre 

Issue History 
Date Modified   Username       Field                    Change               
====================================================================== 
11-21-09 19:45  twodogron      New Issue                                    
11-21-09 19:45  twodogron      OS                        => Windows         
11-21-09 19:45  twodogron      Unstable Impact           => Yes             
11-21-09 19:45  twodogron      Version OS                => XP Professional SP3
11-21-09 19:45  twodogron      Version GTK               => 2.16.6          
11-24-09 21:40  guneeyoufix    Note Added: 0001348                          
11-24-09 21:40  guneeyoufix    Status                   new => feedback     
11-24-09 21:42  guneeyoufix    Project                  Grisbi => Grisbi-0.6.0
11-25-09 08:37  JP Joubert     Note Added: 0001356                          
======================================================================